Inauguration of the Plasco building

The information presented in this study was collected through gathering the limited amount of available information on the structure, generating as-built structural drawings, reviewing construction photographs, interviewing fire-fighters and other witnesses, frame-by-frame analysis of a number of available videotapes showing the structure during the fire as well as during the final stage of collapse. Based on these information and some engineering judgments, the paper summarizes the sequence of events from the start of the fire to final collapse, almost 3.5 h later, and the inferred scenario explaining how the structure collapsed completely. Recommendations are provided based on the lessons learned from that incident.